Sunday, November 29, 2026 · Berkeley, CaliforniaSend a news tip · About

What East Bay riders should know: BART single-tracking Dec. 6 and AC Transit changes Jan. 10

Photo: 4300streetcar / Wikimedia Commons, CC BY 4.0

Several scheduled changes affect East Bay transit over the next two months, according to notices from BART and AC Transit.

BART, Sunday, Dec. 6. Crews will replace lights in the Transbay Tube all day, reducing service from two tracks to one. Trains will run every 30 minutes systemwide. Only the Blue, Yellow and Orange lines will operate, and the Red and Green lines will not run. A Yellow Line shuttle train will run between SFO and Millbrae, so passengers going beyond SFO must transfer. BART says its trip planner will reflect the changes.

AC Transit, Jan. 10. Many lines get new schedules on Jan. 10, in coordination with other Bay Area transit agencies. Detour routing for lines 19, 51A, 96, 851 and O, tied to work on the Webster Tube by the Oakland-Alameda Access Project, is to be removed because construction is scheduled to end in December. AC Transit says that if the Webster Tube work runs into 2027, it will issue service alerts. Line 60 schedules will be adjusted, Line 281 will serve the Silliman Recreation Center in place of Line 216, and many school-supplement schedules will change. The full chart is on AC Transit’s website.

Stop closures. AC Transit has closed the Blanding Avenue at Broadway stops for lines 19, 51A, 663 and 851, because of non-AC Transit construction, from Oct. 30 through Feb. 26, 2027. Alternates include Buena Vista Avenue at Park Street for Line 19 and Broadway at Eagle Avenue for lines 51A and 851. Separately, the San Pablo Avenue at 32nd Street stop used by lines 72, 72M and 802 is moved from Nov. 25 through April 5, 2027.

Riders should check the agencies’ alerts before traveling, since schedules and detours can change.

Sources